Vanguard was chosen to be the preferred contractor for all machinery movements and relocation services plus extensive electrical installation for a UK-based major cable and plastic extension line company.

Vanguard’s scope of work included:
• Disconnection from mains power
• Match-mark of machine parts
• Dismantlement of all equipment
• Uplift and load to transport
• Transportation to new plant
• Offload, reassemble and position
• Reconnection to mains power and control panels
• Relocation of external tanks and pipework to new control panel site
• Decommission of plating line including robotics and extension line
• Offload and installation of transfer press and mould tooling line including water cooling systems

All supervision, health & safety management and skilled mechanical and electrical labour provided by Vanguard VML Group